Photos
We've collected a number of photos from jobs we've been a part of over the years. Take a look at our galleries to see good and poor examples of the building envelope.
Sunset Beach Condos

Recladding of Condo Units after failure. Â Units are less than 5 years old

New Cat 5 Air Barrier which tolerates rain immediately after installation.

Waterfront location.

Recladding of Condo Units after failure. Â Units are less than 5 years old
Window Replacement Wake Forest University

Window Replacement and Renovation projects at WFU

Future Aim Dam opportunity to seal inside openings.

Training contractors at start up.

Window Replacement and Renovation projects at WFU
Office Building Reclad Raleigh, NC

Office Building in Raleigh, NC where owner is re-cladding.

Cat 5 installation during cold weather and rain season.

Field inspection discovered missing wall-roof tie-in. This is the most critical and often missed detail in our industry.

Office Building in Raleigh, NC where owner is re-cladding.
Liquid Flashing and Building Wrap

Properly flashing in building wrap with Prosoco Fast Flash or Air Dam.



Properly flashing in building wrap with Prosoco Fast Flash or Air Dam.
Protective Treatment App State

Rilem Tube testing

Rilem Tube testing

Prosoco Siloxane WB used at App State

Rilem Tube testing
Poor Job Details
Poor Job Building-Wrap Mock Up

Building wrap is mostly done wrong.

This is often the finished detail.

All parties need to understand proper waterproofing details to get the mock up done right.

Building wrap is mostly done wrong.
Poor Job Coastal Elementary School

Many air barrier systems require protection of the wall.

Moisture can cause failures after successful application.

Repairs are costly for all involved, get it done right the first time.

Many air barrier systems require protection of the wall.
Poor Job NC CMU School

Elastomeric membranes require protection of walls for entire project, failure to do so lead to many failures. STPE membranes do not.

Elastomeric membranes and Synthetic Permeable membranes can often re-emulsify if left unprotected. STPE membranes do not.

This was first detected where membrane was leaking our the weeps.

Elastomeric membranes require protection of walls for entire project, failure to do so lead to many failures. STPE membranes do not.
Miscellaneous Jobs

Penetrations not properly flashing with Peel-N-Stick. Liquid Flashing easier to install correctly.

This does not meet Continuous Insulation Building Code Requirements.

Proper sequencing can ensure a watertight installation.

Penetrations not properly flashing with Peel-N-Stick. Liquid Flashing easier to install correctly.